Decorative Concrete
We offer decorative services for any concrete surf... more
FEATURED MERCHANT
Alpha Sitter LLC
Vacation care, overnights, special needs pets, dog... more
News Details (Posted: April 17, 2007):
Lockwood Blvd. Construction Notice: (updated April 16, 2007):
Full Description:
From the City of Oviedo: Construction on Lockwood southbound, south of Mitchell Hammock to Longbranch, is taking longer than anticipated due to problems encountered with pipe installed under previous contracts. Repairs to previously installed work and pressure testing are completed. Final repaving of both lanes wil be completed in approximately one week, weather permitting. Traffic will be impacted during this operation. The pipe installation on Old Lockwood is complete. Pressure testing is complete and the roadway is repaved. Old Lockwood has returned to normal traffic conditions. Please drive safely in work zones.
CONTACT
Let Us Know What You
Like About This Site Email Comments
My Online Neighborhood, Inc. is neither responsible nor liable for any Content posted to this Web Site by anyone other than My Online Neighborhood, Inc., including without limitation, statements or opinions posted to discussion boards or forums, advertising, hyperlinks to other websites, and the like, and makes no representations with respect to the truth or appropriateness of any such third party Content. See Legal Notice for further information.